Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Other Tools

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 03-11-2016, 08:14 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Using SQL Scripts in Deltek Cobra to Update Change Log Entries

I’ve had several clients who have run into a problem with their Baseline Change Log because multiple changes get clumped into a single change log reference number. Read More [URL="http://ow.ly/ZldGV"]http://ow.ly/ZldGV[/URL]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Configuring Deltek Cobra To Use The Primavera P6 API Emily Other Tools 0 01-21-2016 10:01 AM
New Release Of Deltek Cobra Announced at Deltek Insight Conference Emily Other Tools 0 11-14-2014 04:16 PM
How To Change Databases In Deltek Cobra Explained Emily Other Tools 0 09-25-2014 06:13 AM
The Benefits of Upgrading from Deltek Cobra 4.7 to Cobra 5.1 Emily Other Tools 0 10-07-2013 01:02 PM
Deltek Cobra 5 n-Tier Deployment Update Process Emily Other Tools 0 04-19-2012 06:59 AM


All times are GMT -5. The time now is 07:22 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.