Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Other Tools

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 03-29-2017, 07:30 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Deltek Cobra 8.1 New Feature – Database Actual Costs

There’s a new feature in the latest offering of Cobra 8.1 that allows you to load actual costs via a database table, rather than using a .csv file. Here we take a look [URL="http://ow.ly/8NXt30amF6Z"]http://ow.ly/8NXt30amF6Z[/URL]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Configuring Deltek Cobra To Use The Primavera P6 API Emily Other Tools 0 01-21-2016 10:01 AM
Deltek Cobra 5.1.3 Multiple Database Upgrade Wizard Emily Other Tools 0 05-04-2015 06:59 AM
Deltek Cobra Feature Enhancement Wish List Emily Other Tools 0 03-13-2015 07:03 AM
Deltek Cobra 5 Can’t Connect To The Database Emily Other Tools 0 03-26-2013 06:53 AM
Using SQL Statements To Remove A Project From The Deltek Cobra Database Emily Other Tools 0 11-29-2012 08:41 AM


All times are GMT -5. The time now is 07:08 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.