Here's a look at the critical schedule drivers feature in Deltek Acumen Risk to inspect all the probable risk adjusted critical paths in the schedule https://ed.gr/dhi8u
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Performing Activity Nudge Analysis in Deltek Acumen Fuse Emily Other Tools 0 02-09-2018 09:19 AM
Why Using Deltek Acumen for Schedule Analytics is Recommended Emily Scheduling 0 01-18-2018 09:20 AM


All times are GMT -5. The time now is 08:06 PM.


Powered by: vBulletin - Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.