Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 08-28-2019, 05:55 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post What’s the Difference Between Total Float and the Longest Path?

Primavera Professional P6 supports a couple of options when schedulers want to define a critical activity in the Gantt chart; Total Float or the Longest Path. So, what’s the difference between these two? [url]http://ed.gr/btdn2[/url]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 07:34 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.