Post Video – Using Constraints in Primavera P6

Constraints in Primavera P6 are special dates that restricts the start or completion date of activities. If you use a constraint in a schedule, you would set the date of the constraint manually to the date you require, as it is independent of any currently scheduled dates. This can affect the critical path of the schedule, which is why there are concerns about constraint usage; shown in most of the guidelines for good scheduling.

In this video, we will discuss the different types of constraints and common the mistakes made with constraint usage. These can result in a schedule that is impractical, unrealistic, or illogical https://tensix.com/video-using-const...-primavera-p6/
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Video – Setting Up User Preferences in Primavera P6 EPPM Emily Primavera Systems 0 02-01-2021 08:39 AM
Video – Adding Activities in Primavera P6 Emily Primavera Systems 0 11-30-2020 09:46 AM
Video – Developing a WBS in Primavera P6 Emily Primavera Systems 0 09-02-2020 07:35 AM
Premium Project Management PrepCast™ RITETRAC Project Management 0 08-05-2011 08:43 AM
Lesson-01 in Primavera P6 Course : General Idea ( Video ) Grook Primavera Systems 1 06-08-2011 12:14 AM


All times are GMT -5. The time now is 04:49 PM.


Powered by: vBulletin - Copyright ©2000 - 2022, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.