Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 04-27-2016, 07:04 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Video - Creating a Work Breakdown Structure (WBS) in Primavera P6

One of the first steps in planning a project is to break down the project by its major deliverables, i.e. the product or service components. An organized hierarchical break down or decomposition of all the deliverables is known as the Work Breakdown Structure (WBS) of the project. This video discusses the Work Breakdown Structure and demonstrates how to create a simple WBS in Primavera P6 Professional. [url]http://ow.ly/4n9sW7[/url]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
The Primavera P6 Professional Work Breakdown Structure Chart View Emily Primavera Systems 0 02-22-2016 08:32 AM
Creating a Work Breakdown Structure in Primavera P6 EPPM Emily Primavera Systems 0 02-11-2015 07:39 AM
How To Create A Work Breakdown Structure (WBS) In Primavera P6 Emily Primavera Systems 0 11-05-2014 10:17 AM
Work breakdown structure and project management tool askcow Project Management 3 07-04-2013 03:02 AM
Premium Project Management PrepCast™ RITETRAC Project Management 0 08-05-2011 08:43 AM


All times are GMT -5. The time now is 09:24 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.