Post Using Stored Period Performance in Primavera P6

Stored Period Performance forms part of the project update each financial period. It stores the current period values for Planned Value (PV or BCWS), Earned Value (EV or BCWP) and Actual Cost (AC or ACWP). Here's a look at how it all works in Primavera P6 http://ed.gr/47jd
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Undoing Schedule Performance Period Progress in Primavera P6 Emily Primavera Systems 0 02-13-2018 08:16 AM
Displaying a Prime Period Gantt Chart Bar in Primavera P6 Emily Primavera Systems 0 07-08-2016 09:00 AM
P6 won't spread stored period performance kjjnmann Primavera Systems 1 01-26-2016 04:03 PM
Mitigating Performance Issues when Integrating Deltek Cobra with Primavera Emily Other Tools 0 08-14-2013 09:33 AM
how to calculate scheule % complete and performance % complete in primavera using dur henryvex Primavera Systems 0 02-09-2013 05:11 AM


All times are GMT -5. The time now is 07:51 PM.


Powered by: vBulletin - Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.