Post Using Labor Roles in Primavera P6 EPPM

Here's a great tip on how to define and assign labor roles to activities in Primavera P6 EPPM http://ed.gr/24hm
Reply With Quote
  #2  
Old 11-26-2018, 08:08 AM
LiluK's Avatar
Forum Newbie
 
Join Date: Nov 2018
Posts: 4
Moderator will find u)
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
whats new in primavera p6 eppm 17 Proventures Primavera Systems 0 02-27-2018 02:03 AM
Primavera P6 EPPM Defining Baselines Emily Primavera Systems 1 02-13-2017 11:38 PM
Defining Activity Relationships in Primavera P6 EPPM Emily Primavera Systems 0 05-06-2015 07:46 AM
Future Plans for Primavera P6 EPPM Emily Primavera Systems 0 08-16-2012 06:07 AM
Oracle Primavera P6 EPPM R8.1 Screen Shots Emily Primavera Systems 0 09-21-2011 08:17 AM


All times are GMT -5. The time now is 05:14 PM.


Powered by: vBulletin - Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.