Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 03-25-2019, 08:11 AM
Project Addict
 
Join Date: Aug 2011
Posts: 960
Post USACE SDEF Format and Cost Loading a P6 Schedule

Here's a review of the US Army Corp of Engineers mandatory Primavera P6 requirement to cost load a schedule using a lump sum labor resource http://ed.gr/bghjj
Reply With Quote
  #2  
Old 04-04-2019, 07:16 AM
Forum Newbie
 
Join Date: Apr 2019
Posts: 1
Is there anything surprising in this review to some of you more experienced folks?
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 02:57 PM.


Powered by: vBulletin - Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.