Post Simple Method for Updating Progress in Primavera P6

There is a way to make updating progress in Primavera P6 for a construction project schedule simple. But you need the Primavera P6 schedule developed in a way that allows this easy process for updating progress in Primavera P6 http://ed.gr/bwi2f
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Simple Lump Sum Cost Loading in Primavera P6 Emily Primavera Systems 0 09-23-2019 08:07 AM
Tracking Deliverable Progress with the WBS Summary Activity in Primavera P6 Emily Primavera Systems 0 01-28-2019 08:03 AM
Primavera P6 EPPM and the Gantt Chart Late Bar Emily Primavera Systems 1 08-03-2017 06:20 AM
Reporting Schedule Progress in Primavera P6 Emily Primavera Systems 0 03-16-2015 08:39 AM
Primavera P6 EPPM Progress Spotlight Explained Emily Primavera Systems 0 08-07-2013 09:31 AM


All times are GMT -5. The time now is 02:56 PM.


Powered by: vBulletin - Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.