Post Setting the Time and Date Settings In Primavera P6

It doesnít sound like a bid deal, but being sure the time and date settings for the Project Start date, Data Date, and actual activity dates are set in Primavera P6, can report a scheduled finish date with date variance of +- a day http://ed.gr/b6x6c
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Focus date vs actual date sanlen Scheduling 0 02-25-2010 01:41 AM
P3 - How to auto adjust task start date based on predecessor? wazzubrad Primavera Systems 2 06-26-2009 04:45 PM


All times are GMT -5. The time now is 05:15 PM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.