Post Scheduling the First Working Day in Primavera P6

Many contracts require construction work to commence a specified number of days after the contract award or notice to proceed. The question is how best to schedule this first working day in a Primavera P6 schedule? https://tensix.com/scheduling-the-fi...-primavera-p6/
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
As Late As Possible Scheduling Constraint In Primavera P6 EPPM Explained Emily Primavera Systems 0 06-26-2018 06:56 AM
Primavera P6 EPPM Scheduling Privileges with Limited Project Data Privileges Emily Primavera Systems 0 10-14-2015 08:17 AM
Scheduling a 24-hour Elapsed Time Lag In Primavera P6 Emily Primavera Systems 0 01-16-2015 07:56 AM
resource constrained project scheduling in Primavera mshahbazi Primavera Systems 8 10-03-2010 01:50 PM
Scheduling MS Project like Primavera dcat Microsoft 0 06-12-2009 05:35 AM


All times are GMT -5. The time now is 04:10 PM.


Powered by: vBulletin - Copyright ©2000 - 2022, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.