s-curve in Primavera

This is related to P6 version 7.

We are interested in getting s-curves for the physical percentage progress for the project based on monthly updates of physical progress %.

The project progress to be calculated based on weightages assigned manually to each activity to roll-up to the wbs and ultimately to the project level.

shall be thankful for a response

tapan sengupta
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Lesson-01 in Primavera P6 Course : General Idea ( Video ) Grook Primavera Systems 1 06-08-2011 01:14 AM
Primavera keeps changing dates when I don't want it to mmiller Primavera Systems 1 06-23-2010 07:02 AM
Oracle Buys Primavera pmkb Primavera Systems 0 12-05-2008 09:00 AM
primavera and excel alaaalhaj Primavera Systems 0 08-02-2007 03:58 AM
s curve Arcicorci Project Management 2 07-20-2006 06:00 AM


All times are GMT -5. The time now is 11:37 AM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.