Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 01-22-2020, 09:42 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post A Quick Way to Remove All Relationships from a Primavera P6 Schedule

Primavera P6 Professional supports the removal of all relationships from a project schedule. There are a number of ways to do this and this quick tip explains one great way how to achieve it [url]http://ed.gr/b5s76[/url]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Removing All Schedule Activity Relationships ‘the Cool Way’ in Primavera P6 Emily Primavera Systems 0 12-11-2017 09:16 AM
How to Remove All Relationships in Primavera P6 Emily Primavera Systems 0 10-10-2017 07:18 AM
Primavera P6 Professional and Schedule Automatically Quick Tip Emily Primavera Systems 1 05-30-2017 06:25 AM
Primavera P6 Professional Reporting - Tabulated Schedule Reporting Emily Primavera Systems 0 04-18-2017 06:56 AM
Primavera P6 Activity Relationships Explained Emily Primavera Systems 0 09-24-2014 05:50 AM


All times are GMT -5. The time now is 10:28 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.