Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 04-19-2018, 04:59 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Primavera P6 Schedule % Complete Explained

Here's an explanation and demonstration of the Primavera P6 schedule % complete value for analyzing and reporting planned progress, as per the Data Date [url]http://ed.gr/ro4l[/url]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 and the Finish On or Before Schedule Constraint Explained Emily Primavera Systems 0 10-21-2016 08:04 AM
Primavera P6 Physical Percent Complete Progress Type and Summaries Explained Emily Primavera Systems 0 07-27-2016 06:21 AM
New Video - Primavera P6 Percent Complete Types Explained Emily Primavera Systems 0 10-09-2013 04:25 PM
how to calculate scheule % complete and performance % complete in primavera using dur henryvex Primavera Systems 0 02-09-2013 05:11 AM
Primavera P6 Date Fields Explained ColinP Primavera Systems 2 02-08-2012 01:12 PM


All times are GMT -5. The time now is 03:11 PM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.