Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 07-21-2021, 07:53 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,130
Post Primavera P6ís Schedule Comparison Feature Explained

The Schedule Comparison feature in Primavera P6 Visualizer is great for comparing the differences between two projects or a project and its baseline. Here's a look at it's capabilities https://ed.gr/djozi
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 Schedule % Complete Explained Emily Primavera Systems 0 04-19-2018 05:59 AM
Primavera P6 and the Finish On or Before Schedule Constraint Explained Emily Primavera Systems 0 10-21-2016 09:04 AM
Primavera P6 Professional Trace Logic Feature Explained Emily Primavera Systems 0 05-16-2016 07:51 AM
Primavera P6 Activity Relationships Explained Emily Primavera Systems 0 09-24-2014 06:50 AM
Primavera P6 Date Fields Explained ColinP Primavera Systems 2 02-08-2012 02:12 PM


All times are GMT -5. The time now is 08:52 PM.


Powered by: vBulletin - Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.