Post Primavera P6 EPPM and the Gantt Chart Late Bar

Here's how to display an activity late bar on the Gantt chart in Primavera P6 EPPM https://tensix.com/2017/07/primavera...hart-late-bar/
Reply With Quote
  #2  
Old 08-03-2017, 05:20 AM
Project Hobbyist
 
Join Date: Oct 2016
Posts: 50
Thumbs up Gantt chart in Primavera P6 EPPM

Primavera P6 Release 8.2 provides several tools that enable you to quickly view the status of your project against the baseline plan. Comparing the status of the project against it’s baseline is useful for understanding the success or issues with your project. The Progress Line in the application is an excellent tool for viewing variances between selected activity data and the baseline. The Progress Line provides a visual representation between selected activity criteria such as the start or finish dates of activities in the current project versus the baseline project, or the progress of an activity based on its remaining duration or percent complete.

How to use the Progress Line in P6

Applying a progress line to the Gantt chart enables you to quickly view the progress of activities with regard to their scheduled deadlines. As a variance line, the progress line can represent a variance between the planned (ie. baseline) and actual start or finish dates of an activity. As a progress point line, the progress line shows either the remaining duration of an activity or the percent complete of an activity. When the progress line is displayed, it is simple to quickly view the status of your schedule. If the progress line is drawn to the left of the data date, the activity is behind schedule. If the progress line is drawn on the data date, the activity is on schedule. When the progress line is drawn to the right of the data date, the activity is ahead of schedule.

The Progress Line can be displayed by accessing the View menu and selecting the Progress Line. The calculation for the Progress Line can be identified by accessing “Bar Chart Options” from the Layout Options Bar. The Bar Chart Options dialog box gives you the ability to select the thickness and color of the progress line. The baseline will need to be selected in order to be used as the basis for the calculations.

The Progress Line can be calculated based upon the following options:

1. Difference between current and baseline activity’s start or finish dates.
2. Connect Points based upon the activity’s remaining duration or % complete.

The Progress Line will be drawn from the Data Date if:

the activity is a milestone
the activity does not exist in the baseline
the activity is completed
the activity is not started and the baseline start is on or after the Data Date
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 03:06 PM.


Powered by: vBulletin - Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.