Post Primavera P6 Duration Type Explained

Primavera P6 Duration type is an important setting that determines how you want P6 to behave when an additional resource is added to an activity. Here's a look at the differing duration types and their effect on your schedule. https://ed.gr/cyfka
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 EPPM Duration Percent Complete Explained Emily Primavera Systems 0 07-25-2018 08:01 AM
Primavera P6 Schedule Progression and Duration Type Emily Primavera Systems 0 11-21-2017 09:30 AM
Primavera P6 Duration Type and Progressing a Schedule Emily Primavera Systems 0 05-01-2017 07:49 AM
Primavera P6 Physical Percent Complete Progress Type and Summaries Explained Emily Primavera Systems 0 07-27-2016 07:21 AM
Primavera P6 Date Fields Explained ColinP Primavera Systems 2 02-08-2012 02:12 PM


All times are GMT -5. The time now is 05:43 PM.


Powered by: vBulletin - Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.