Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 04-26-2017, 07:28 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Primavera P6 and Activity % Complete

Here we demonstrate the direct correlation between Activity % Complete and the assigned activity percent complete type [URL="http://ow.ly/k9Lh30bbN6S"]http://ow.ly/k9Lh30bbN6S [/URL]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Driving and Free Float Activity Properties In Primavera P6 Emily Primavera Systems 0 11-23-2015 08:10 AM
Basing Activity Progress on a Unit Measurement In Primavera P6 Emily Primavera Systems 0 10-05-2015 07:56 AM
Activity Codes in Primavera P6 EPPM Emily Primavera Systems 0 04-27-2015 05:59 AM
Primavera P6 Activity Relationships Explained Emily Primavera Systems 0 09-24-2014 05:50 AM
Primavera P6 Activity Steps Explained Emily Primavera Systems 0 09-10-2014 05:20 AM


All times are GMT -5. The time now is 01:19 PM.


Powered by: vBulletin - Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.