Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 07-31-2015, 08:38 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Missing Level of Effort bar in P6 Professional Gantt Chart Solved

For the longest time, Primavera P6 Professional has been shipping with a defect in one of the sample layouts. The configuration of the Remaining Level of Effort bar in the Classic Schedule Layout is incorrect. The result of this is the bar failing to appear when the user creates a Level of Effort activity. Here's how to fix it [URL="http://ow.ly/QkD5H"]http://ow.ly/QkD5H[/URL]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 Gantt Chart Attachments Emily Primavera Systems 0 05-28-2015 06:06 AM
Assigning Notepad Labels to Primavera P6 Gantt Chart Bars Emily Primavera Systems 0 04-08-2015 11:14 AM
Primavera P6’s Systematic Approach to Displaying Gantt Chart Bars Emily Primavera Systems 0 03-30-2015 07:19 AM
Inserting Gantt Chart Gridlines in Primavera P6 Emily Primavera Systems 0 03-20-2015 07:36 AM
Using Level of Effort (LOE) Activities in Primavera P6 Emily Primavera Systems 0 01-06-2015 10:47 AM


All times are GMT -5. The time now is 11:31 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.