Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 01-30-2018, 05:24 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post How To Perform A Top-down Estimate In Primavera P6

This article demonstrates how to perform a top-down estimate in Primavera P6 Professional [URL="http://ed.gr/mkld"]http://ed.gr/mkld[/URL]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oracle Vision for Project Management at the 2013 Oracle Primavera Virtual Summit SarahEPPM Project Management 1 07-09-2013 09:18 AM
Open Primavera P6 Training Classes - Virginia Beach, VA Emily Primavera Systems 0 07-24-2012 07:34 AM
Primavera Online Training | Primavera Classes | Primavera Courses Cost: $701 only john_taylor Marketplace 1 05-31-2012 07:57 AM
When to get the "best" estimate? nukedaddy Estimating 4 05-13-2012 02:40 PM
Oracle Buys Primavera pmkb Primavera Systems 0 12-05-2008 09:00 AM


All times are GMT -5. The time now is 12:14 PM.


Powered by: vBulletin - Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.