Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 05-11-2018, 07:06 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,014
Post How Long Is a Primavera P6 Day, Week, Month or Year?

When it comes to project scheduling, we need the length of a Day to be consistent. The same goes for a Week, a Month and even a Year. Here we look at how Primavera P6 achieves this and just what a Primavera P6 day actually is https://tensix.com/2018/05/how-long-...month-or-year/
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 Four Week Schedule Look Ahead Emily Primavera Systems 0 05-18-2016 08:03 AM
Setting Up a Four-Day Work Week in Primavera P6 EPPM Emily Primavera Systems 0 03-09-2015 08:58 AM
Setting Up a 4-Day Work Week in Primavera P6 Emily Primavera Systems 0 02-04-2015 01:43 PM
Primavera Online Training | Primavera Classes | Primavera Courses Cost: $701 only john_taylor Marketplace 1 05-31-2012 07:57 AM
Oracle Buys Primavera pmkb Primavera Systems 0 12-05-2008 09:00 AM


All times are GMT -5. The time now is 10:07 AM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.