Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 11-22-2019, 08:38 AM
Project Addict
 
Join Date: Aug 2011
Posts: 974
Post How to Display Line Numbers in Primavera P6

Reviewing schedules and collaborating during meetings can be easier using line numbers in Primavera P6. This can be especially true with large projects where Activity Idís can be long and complex. So here's how you display line numbers in P6 http://ed.gr/b0n2b
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How To Display Text On The Primavera P6 Gantt Chart Emily Primavera Systems 0 04-05-2019 08:23 AM
How to Display 4 Baselines on the Gantt Chart in Primavera P6 Emily Primavera Systems 0 03-27-2018 08:05 AM
Primavera P6 and Line Numbers Emily Primavera Systems 0 10-25-2017 08:42 AM
Primavera P6 EPPM and the Progress Line Emily Primavera Systems 1 08-07-2017 06:04 AM
Introducing the Primavera P6 Progress Line Emily Primavera Systems 0 09-16-2015 08:47 AM


All times are GMT -5. The time now is 05:13 PM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.