Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 11-05-2014, 10:17 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post How To Create A Work Breakdown Structure (WBS) In Primavera P6

Here are step-by-step instructions on how to create a Work Breakdown Structure (WBS) in Primavera P6 [URL="http://ow.ly/DRzjn"]http://ow.ly/DRzjn[/URL]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
When Resource Leveling in Primavera P6 Won’t Work Emily Primavera Systems 0 05-29-2014 07:19 AM
Do You Know What a Benefits Breakdown Structure Is? Emily Project Management 2 08-21-2013 11:43 AM
Work breakdown structure and project management tool askcow Project Management 3 07-04-2013 03:02 AM
Primavera Online Training | Primavera Classes | Primavera Courses Cost: $701 only john_taylor Marketplace 1 05-31-2012 06:57 AM
PMBOK terminology for WBS structure pixelfreak Planning 1 02-17-2011 06:32 AM


All times are GMT -5. The time now is 08:15 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.