Post How to Create Activities in Primavera P6 EPPM

After creating our Work Breakdown Structure (WBS), the next logical step in the project creation process is to create our activities in Primavera P6 EPPM.

Quite often, a skilled scheduler who has been involved in the project creation process is required to define these activities. Developing a realistic schedule requires comprehensive estimated planned durations that correspond with correct activity definitions. Letís take a closer look at how to create activities in Primavera P6 EPPM https://tensix.com/2020/10/how-to-cr...avera-p6-eppm/
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to Create a Portfolio in Primavera P6 EPPM Emily Primavera Systems 0 05-18-2020 07:25 AM
How to Use the Dissolve Activities Feature in Primavera P6 EPPM Emily Primavera Systems 0 11-13-2019 09:22 AM
Dissolving Activities in Primavera P6 EPPM Emily Primavera Systems 0 06-04-2018 06:49 AM
Primavera P6 EPPM Ė Reporting on Critical & Near Critical Activities Emily Primavera Systems 0 05-01-2015 05:40 AM
Defining Activities in Primavera P6 EPPM Emily Primavera Systems 0 04-17-2015 06:00 AM


All times are GMT -5. The time now is 02:53 AM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.