Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 08-24-2020, 06:21 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,086
Post Developing a Work Breakdown Structure in Primavera P6

Building a Work Breakdown Structure in Primavera P6 is a fairly simple process as long as you capture all the deliverables. In our example, we'll take you through how to ensure you capture all the deliverables in P6 http://ed.gr/crwrg
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 EPPM’s Work Breakdown Structure Emily Primavera Systems 0 07-20-2018 06:16 AM
Video - Creating a Work Breakdown Structure (WBS) in Primavera P6 Emily Primavera Systems 0 04-27-2016 07:04 AM
The Primavera P6 Professional Work Breakdown Structure Chart View Emily Primavera Systems 0 02-22-2016 08:32 AM
Creating a Work Breakdown Structure in Primavera P6 EPPM Emily Primavera Systems 0 02-11-2015 07:39 AM
How To Create A Work Breakdown Structure (WBS) In Primavera P6 Emily Primavera Systems 0 11-05-2014 10:17 AM


All times are GMT -5. The time now is 03:32 AM.


Powered by: vBulletin - Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.