Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Peer Support > Primavera Systems

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 03-11-2020, 08:01 AM
Project Maniac
 
Join Date: Aug 2011
Posts: 1,177
Post Creating a Simple P6 Cost Curve in Microsoft Excel

Most schedule specifications require resource and cost loading. Usually, there is also a requirement to provide a cost curve. Primavera will produce a P6 cost curve, but you can also easily create one in Microsoft Excel [url]http://ed.gr/cafv1[/url]
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Simple Lump Sum Cost Loading in Primavera P6 Emily Primavera Systems 0 09-23-2019 06:07 AM
Creating a Risk Register in Microsoft Project Emily Microsoft 0 05-02-2018 06:28 AM
It department mcupryk Estimating 13 12-11-2014 03:32 AM
How to use Primavera P6's Time Distributed Reporting and Microsoft Excel Emily Primavera Systems 0 11-01-2013 08:15 AM
Projity offers free OpenProj replacement for Microsoft Project pmkb Other Tools 2 07-16-2008 09:43 PM


All times are GMT -5. The time now is 08:02 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.