Post The 14-Point Assessment and Schedule ‘Missing Logic’ Inspection

Here we explore an assessment to confirm your schedule is not ‘missing logic’ http://ow.ly/iHaD302NwN0
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
The 14-Point Schedule Assessment and the Baseline Execution Index (BEI) Emily Project Management 0 07-13-2016 05:40 AM
GAO Releases Schedule Assessment Guide Emily Project Management 1 01-14-2016 01:48 PM


All times are GMT -5. The time now is 02:35 AM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.