Project Management Knowledge Base

Go Back   Project Management Knowledge Base > Project Management Knowledge Base > Scheduling

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 01-31-2018, 07:55 AM
Project Addict
 
Join Date: Aug 2011
Posts: 994
Post Duration Uncertainty

Here's an interesting look at uncertainty in duration estimates, a major challenge to realistic scheduling http://ed.gr/mom0
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Primavera P6 Schedule Progression and Duration Type Emily Primavera Systems 0 11-21-2017 07:30 AM
Primavera P6 Duration Type and Progressing a Schedule Emily Primavera Systems 0 05-01-2017 07:49 AM
Using Physical and Duration Percent Complete Types In Primavera P6 Emily Primavera Systems 0 03-02-2015 07:14 AM
Reduce duration BGNS Project Management 1 10-02-2010 06:30 PM


All times are GMT -5. The time now is 06:47 PM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.