Post The DCMA 14-Point Assessment and Schedule Relationships

The DCMA 14-point assessment prefers the finish-to-start (FS) relationship for defining the interface between activities. Here we take a look at this in more detail http://ow.ly/Hrwx304XdR9
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
The 14-Point Assessment and Schedule ‘Missing Logic’ Inspection Emily Project Management 0 08-01-2016 06:00 AM
The 14-Point Schedule Assessment and the Baseline Execution Index (BEI) Emily Project Management 0 07-13-2016 05:40 AM
GAO Releases Schedule Assessment Guide Emily Project Management 1 01-14-2016 01:48 PM
Schedule Contingency Rob Green Scheduling 15 11-06-2010 07:04 PM


All times are GMT -5. The time now is 02:43 AM.


Powered by: vBulletin - Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.