Exclamation Typical Engineering costs

I am doing an Internship in an Engineering Firm that develops projects for Oil Refinery Companies in USA.

Right now, I am working on a cost analysis of the project portfolio. I need to find out how much should be the engineering costs in the different project phases as a percentage of the total project cost (Total Installed Cost-TIC).

PHASES ENGINEERING COST ( % of TIC)

- Conceptual Design (Front-End Design 1) Range (A-B%)
- Detailed Design (Front-End Design 2) Range (A-B%)
- Procurement Range (A-B%)
- Construction Range (A-B%)
- Closeout Range (A-B%)

The idea is to compare their current engineering costs with standard values used in the market to evaluate the project performance.

Is there anyone who has done something symilar or can give me some reference links of any research about how the typical engineering costs are allocated in the different phases of Oil Refineries projects? Is there a graphic with different kinds of complexity projects that stablishes typical engineering costs?

Thanks so much for any information that you can provide me,

Best Regards,
Nadima Roa
Reply With Quote
  #2  
Old 08-10-2007, 06:46 AM
pmkb's Avatar
Administrator
 
Join Date: Aug 2005
Location: Cyberspace
Posts: 326
Hi Namida, welcome to the forum.

You might try contacting the [url=http://www.npra.org/]NPRA[/url] and see if they have any industry statistics (or if they can point you in the right direction).

I'd imagine that most engineering firms keep those metrics for their own projects. You might also try contacting [url=http://www.kbr.com/]KBR[/url] or other large engineering companies and see if they are willing to share some average statistics.
__________________
"I love it when a plan comes together." - Colonel John "Hannibal" Smith, A-Team
Reply With Quote
  #3  
Old 08-13-2007, 06:45 AM
Forum Newbie
 
Join Date: Aug 2007
Posts: 2
Thanks Pmkb for your answer.
I wrote an email to NPRA, I hope they can give some statistics.
Regards,
NR
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 09:12 AM.


Powered by: vBulletin - Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.