Default Six Sigma In Project Management

Many people think Six Sigma works for repetitive processes and has no application for project situations. Project situations are common in companies and functions that carry out construction, commissioning and installations, software development, plant and machinery development and manufacture, research & development etc.

Although these sectors have significant differences in challenges that they face, the common element is that they carry out projects and each project is unique in itself.

To understand the applications of Six Sigma in companies that carry out projects, let us take example of construction industry (as most people have some familiarity with this sector)

In construction industry, Six Sigma usage can be understood with following points.

1. Recurring problems exist at each stage of construction. When I say recurring, it means recurring for the company (may be -not for individual projects)

2. If you study a construction project, it comprises of large number of individual processes ranging from soil testing to landscaping to structural designs to foundations, superstructure, interiors and exteriors. There are a whole lot of purchase and logistic processes as well.

3. A good number of these processes are common to all projects. If processes were robust many of the individual problems would not occur at the first place. The remaining can be reduced.

4. The idea in Six Sigma is about making the processes robust ( so that the results are right the first time, every time)

5. Not all processes are equally important. Processes that matter are those that relate closely to pain areas (for customers/ management). These processes need improvement.

6. In each project, individual project managers, site engineers face a whole lot of problems that they solve. These problems do get solved in the project (after they have caused a delay or cost in the specific project). Normally there is no mechanism to aggregate learning from the experiences of these managers and use it for process improvement. Also companies do not have structured mechanism to use tried and tested techniques to eliminate or reduce such issues in future projects.

7. To be able to study and improve management systems one needs a structured approach that should include
a. Identifying individual problem areas (or focus areas) and prioritizing them.
b. Next, we need techniques to identify the root cause of the problem.
c. Once we identify the root cause, we need to generate solution alternatives, compare them and select the best.
d. We then need to implement the best solution and see how it works.
e. If successful, we wish to institutionalize the solution.

8. Six Sigma provides tried and tested techniques for steps A to E in a team based approach which converts each problem area into an individual "improvement project"

9. When processes improve, there is a reduction in problems and defects.

10.Primary defects in construction industry (and most of the project driven industries) are DELAY, REWORK and COST OVERRUNS and Six Sigma can be used to reduce any of these defects.

This is not all. In addition to usage in improvements in existing processes (as explained above), Six Sigma is also used to design new processes (or redesign existing processes that contribute to project success (with better predictability that ever before).

________________________________________
To Know More:

VISIT OUR WEBSITE AT: http://www.benchmarksixsigma.com

STUDENTS CAN VISIT US AT: http://www.sixsigmaindia.com

Also, JOIN FREE DISCUSSIONS ON SIX SIGMA - Please visit
http://www.benchmarksixsigmaforum.com
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiNetscape this post!Stumble this Post!
Reply With Quote
Reply

Tags
6 sigma, lean 6 sigma, six sigma, sixsigma india, training

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Project Management Course projectmanagementcourse Marketplace 3 01-23-2012 10:33 PM
Endeavour Software Project Management Alpha 3.0 released! e-cuellar Marketplace 1 12-21-2011 06:00 AM
AcmePlan 1.1 - Simple and clear project management! pilovik Marketplace 1 08-25-2008 11:12 PM
UC Irvine Extension Host First Project Management Education Planning Webinar Jen Echo Planning 0 08-25-2006 11:06 AM


All times are GMT -5. The time now is 04:19 PM.


Powered by: vBulletin - Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO ©2009, Crawlability, Inc.
Copyright (c) 2005 Measuring Up. All rights reserved.